Sourcery Set 2 The Briefing

Every organisation already runs on words like these.

An imagined processing site, one decision, and the words that say who may make it.

Delegations of authority

Version 1 DraftApproved by the board, 1 July
  1. 2.1 The general manager may defer planned maintenance up to 14 days.
  2. 2.2 Longer needs the chief operating officer.
  3. 2.3 Safety can stop any job.
In force 1 July to 31 October
Version 2 Approved by the board, 1 November
  1. 2.1 The general manager may defer planned maintenance up to 7 days.
In force from 1 November · 2.2 and 2.3 unchanged
Operations committee · 14 October · Item 4.2

Mill 2 liner reline: request to defer

1 Decision sought

Defer the Mill 2 reline planned for 14 October.

2 Background

Below 30 mm a liner must be replaced. The high-grade campaign runs to 24 October.

3 Evidence

ReliabilityDrafted by the reliability assistantChecked · Wen Li

41 mm now, wearing 0.8 mm a day. Bolt 14 tension is down 6%; its sensor was calibrated on 2 October.

41 30 30 mm minimum day 10: 33 mm day 14: 29.8 mm
OperationsDrafted by the operations assistantChecked · Brooke Tan

Relining takes 36 hours and would stop the high-grade campaign.

FinanceDrafted by the finance assistantChecked · Rahul Iyer

Relining now: about $1.9 million of lost production. An unplanned failure: about $6 million.

SafetyDrafted by the safety assistantChecked · Maria Kovac

At 14 days the liner would be under 30 mm. We would stop that job.

4 Options

  1. AReline on 14 October.
  2. BDefer 14 days.Safety would stop this
  3. CDefer 10 days: rescan on day 5, check bolts daily, stop below 32 mm.

5 Decision

C, within delegation 2.1.

Nadia ItoGeneral manager · 14 October
Appendix A Who may decide Version 1 · from 1 JulyVersion 2 · from 1 November
Assistants propose. People decide.

New rules apply from the day they’re approved. Earlier decisions keep the rules they were made under.

The decision register

DateDecisionUnderEvidenceDecided by
1 JulDelegations, version 1Board resolutionPolicy textThe board
14 OctMill 2 reline deferred 10 days, with conditions2.1, version 1Liner scan, 13 Oct; bolt tension (sensor calibrated 2 Oct); campaign plan; risk costing; safety reviewNadia Ito, general manager
1 NovDelegations, version 2: over 7 days needs the COOBoard resolutionReview of deferralsThe board
9 NovMill 1 reline deferred 10 days2.2, version 2Liner scan, 8 Nov; safety reviewFarid Haddad, chief operating officer

The next general manager inherits the reasoning, not just the results.

The same story as a film, drawn from the page’s own score.

The site, its people and its numbers are imaginary. Today Sourcery can turn a described way of working into software where every change is proposed, checked, decided by an accountable person and recorded; this has been shown internally, not yet in public. Assistants drafting for every department, and live delegations across a whole organisation, are where it’s heading. Claimipedia, opening soon, comes first.